Difference between revisions of "Assumptions"
From WikiDreams
Line 2: | Line 2: | ||
==Background== | ==Background== | ||
− | ==[[eDream Strategy]] | + | ==[[eDream Strategy]]== |
==[[Enablement Strategy]]== | ==[[Enablement Strategy]]== | ||
− | This is a grid that describes the minimum requirements that need to be achieved to address each of the | + | This is a grid that describes the minimum requirements that need to be achieved to address each of the [[Enablement Components|enablement components]] and the strategy as to how they will be addressed. |
Revision as of 08:47, 22 September 2013
Assumptions are the basis for understanding whether an eDream and it's pursuit it is a good idea. It is the understanding of the specific requirements to make it successfully happen.
Background
eDream Strategy
Enablement Strategy
This is a grid that describes the minimum requirements that need to be achieved to address each of the enablement components and the strategy as to how they will be addressed.